What usually goes wrong with cast and machined parts, and how we prevent it
Buyers tell us the same five problems. Each one has a fixed answer in the way we run a project.
Problem: Delivery dates slip without warning
Our answer: Dates you can plan with
We agree the schedule with the manufacturer before the order, follow production against it and warn you early if a date is at risk.
Problem: Samples are good, series parts are not
Our answer: Checked during series production
On-site in-process inspection and a pre-shipment inspection, each with a written report.
Problem: The supplier promised more than it can deliver
Our answer: A manufacturer chosen for the part
We select the shop whose process, equipment and experience fit your part, not the one that needs to fill capacity.
Problem: Nobody reads the drawing properly
Our answer: Engineering review before the quote
Critical features, tolerances and material are checked first, so questions come up before the first samples.
Problem: Inspection and approval are unclear
Our answer: A defined approval sequence
First article report and material certificate before series. You can audit the manufacturer yourself.
What we supply
Five process families, one contact. Every part follows the same review and inspection sequence.
CastingSand, die, permanent mould, investment, centrifugal and continuous casting.Casting processes
ForgingClosed-die and open-die forgings, raw or fully machined.Forging
CNC machiningTurning, milling, grinding, EDM, laser and waterjet cutting.Machining processes
Engineering plasticsMachined and moulded parts in PA, POM, PE-UHMW and PEEK.Engineering plastics
Secondary operationsHeat treatment, coating, painting and assembly in the same order.Secondary operations
How a project runs
Who does what at each step. QProcess stays between you and the manufacturer from the first drawing to the delivered batch.
Step 1: Engineering review
- You
- Send drawing, material, quantities
- QProcess
- Check tolerances, material, critical featuresAsk open questions
- Manufacturer
- Nothing at this step
- You receive
- Question listbefore any price
Step 2: Process & production planning
- You
- Nothing at this step
- QProcess
- Match process, equipment and capacity
- Manufacturer
- Confirms feasibility and price
- You receive
- Selected routeprocess and manufacturer
Step 3: Quotation
- You
- Approve the order
- QProcess
- One offer: part, tooling, inspection, delivery
- Manufacturer
- Nothing at this step
- You receive
- Quotationin 3–5 working days
Step 4: First articles
- You
- Approve the samples
- QProcess
- First article inspectionCheck 3.1 certificate
- Manufacturer
- Makes first articles
- You receive
- FAI report, 3.1 certificatebefore series release
Step 5: Series and delivery
- You
- Receive parts EXW, FCA or DAP
- QProcess
- In-process inspection on sitePre-shipment inspectionExport documents
- Manufacturer
- Series production
- You receive
- Inspection reportswith every shipment
Every batch approved before it ships.
Four checkpoints between your drawing and your goods-in. Problems are found in Türkiye, not at your receiving inspection.
Engineering review
with the manufacturer, before the order
First articles
FAI report and 3.1 certificate
In-process
on site, during series production
Pre-shipment
parts, packaging, documents

You can audit the manufacturer yourself
Close to production in Türkiye's industrial heartland
We work with foundries, forges and machine shops in Marmara and Central Anatolia, coordinated from our office in Istanbul and close enough to be on site when production needs us.
- Marmara
- Eskişehir
- Ankara
- Konya
Industries we supply
Parts for machines that work hard. Each industry has its own page with typical parts and requirements.
How quickly do we get a quotation?
Usually within 3 to 5 working days after we have the drawing, material and quantities. If something is unclear, we ask first and tell you when the offer will follow.
Who is responsible if parts do not match the drawing?
QProcess. We handle the nonconformity with the manufacturer and keep you informed until it is closed.
Can we audit the manufacturer?
Yes, together with QProcess or on your own.
Are our drawings kept confidential?
Drawings are handled confidentially and used only to quote and produce your parts. Before a drawing goes to a manufacturer, we remove your company name and logo from it. We share drawings only with the manufacturers we ask to quote, and we sign a non-disclosure agreement on request.
Send your drawing. You get a quotation in 3 to 5 working days.
Your drawings are handled confidentially; NDA on request.